S-a Books Ford Y-block Engines: How To Rebuild And Modify Part Number 257 on 2040-parts.com
Weiner, Arkansas, United States
Installation Manuals for Sale
- S-a books ls swaps: how to swap gm ls engines into almost anything part 156(US $35.61)
- S-a books how to rebuild the small-block chevrolet part number 26(US $30.81)
- S-a books high-performance ignition systems: design, build and install part 79(US $35.61)
- S-a books how to build high-performance chevy ls1/ls6 v-8s engines part 86(US $35.61)
- S-a books lost hot rods: remarkable stories of how they were found part ct487(US $40.60)
- S-a books how to rebuild and modify th350 transmissions book part number 326(US $35.61)
Smile, You’re On Camera
Tue, 18 Feb 2014A COUNCIL in east London has rolled out the first unattended CCTV enforcement system for moving traffic offences, in a bid to curb drivers from making illegal turns or stopping in yellow-box junctions. Redbridge council has placed cameras at four trouble spots, which can also catch drivers ignoring restricted access signs. Redbridge council's environment, transportation and crime committee head, Shoaib Patel, said: "The system was installed to counter the high number of drivers that were ignoring the traffic restrictions that were in place, causing severe safety hazards to pedestrians and other drivers.
Toyota recalls Highlander hybrid, Lexus RX 400h
Wed, 29 Jun 2011Toyota is recalling about 82,000 hybrid vehicles in the United States to fix a flawed control board inside the powertrain. The recall covers about 45,000 Toyota Highlander hybrids and 36,700 Lexus RX 400h hybrids from the 2006 and 2007 model years. Toyota says some of the transistors on the control board might have been improperly soldered and could be damaged from large current flow during high-load driving.
First sight of Pininfarina-designed Eurostar trains
Fri, 19 Oct 2012Eurostar has unveiled the first images of its new Pininfarina-designed e320 trains that are currently under construction in Germany. A £700m overhaul of the Eurostar fleet has seen a refurbishment of its existing trains as well as the purchase of 10 new trains designed by the Italian design house. The entire new Eurostar fleet should be completed by 2015 with production of the new e320 trains and refurbishment of the existing trains well underway.