Find or Sell any Parts for Your Vehicle in USA

Snap On 1/2" Drive 3-3/8" Long T60 Torx Socket #stxl60 on 2040-parts.com

US $29.95
Location:

Macungie, Pennsylvania, US

Macungie, Pennsylvania, US
Returns Accepted:Returns Accepted Refund will be given as:Money Back Item must be returned within:14 Days Return shipping will be paid by:Buyer Restocking Fee:No Return policy details: IMPACT:SNAP ON

THIS AUCTION IS FOR: SNAP ON 1/2" DRIVE 3-3/8" LONG T60 TORX SOCKET #STXL60

CONDITION: USED GOOD SHAPE

ITEMS INCLUDED: 1/2" DRIVE TORX T60 SOCKET

PAYMENT: PAYPAL

SHIPPING:  BUYER TO PAY SHIPPING AND HANDLING CHARGES FREE (USPS PARCEL POST) IN THE CONTINENTAL UNITED STATES ONLY NO PO BOXES THIS MEANS THE BUYER MUST HAVE A CONFIRMED STREET ADRESS

 


Powered by eBay Turbo Lister
The free listing tool. List your items fast and easy and manage your active items.

Nissan Juke – the production Qazana

Thu, 07 Jan 2010

First picture of the Nissan Juke Crossover The Nissan Qazana Concept was previewed last Spring at the Geneva Motor Show and – despite its rather outlandish looks – was something of a hit. It had originality and seemed to hit the mood of the moment. Something at least brodering on original in a compact crossover.

BMW X3 xDrive35d & xDrive20i revealed: UK gets X3 xDrive35d

Sat, 06 Aug 2011

2012 BMW X3 Update: UK specs and prices added at the bottom – thanks BMW UK. The new BMW X3 is turning in to something of a star for BMW, as we discovered when we recently reviewed the latest X3, but the reveal of the 2012 BMW X3 X3 xDrive35d for the UK should make the X3 even more appealing. BMW has actually revealed two new X3s for 2012, but the UK won’t be getting the X3 xDrive20i because BMW UK has decreed that X3s in the UK are going to be diesel only.

July 9: Keeping it topped off

Fri, 09 Jul 2010

As expected, when I walked back to my parking space at VSP parking across the street from Burbank Airport the i-MiEV was fully charged. No problem. It had more than 24 hours to get charged and it can't take more than 16 hours to do it, if you figure one hour per kWh at 120 volts.